Looking back at the blog it was two years ago that I started the base. It was fun building and more fun to hang out in for the past year and something. We keep camping overnight, I have done a two night stay at least once. Wish I'd made hash marks for each night camped, I have no idea how many times now.
Observations:
I would not change much of anything on my build. It suits my place and needs very well. A solid foundation is crucial to any building large or small, my piers have done well but some settling occurred and while I've shimmed and jacked a little bit it seems the span under the door sags so it sticks a bit. I really need to get more support in that area.
The pallets. As a sub floor I think they are working very well. I'd use them again on a similar project (and have!) even the ones that stay exposed outside are holding up well. I never even coated them for weather proofing since screws where used I can replace them with similar sized pallets anytime. I wish I'd used better pallets there, the middle one kind of has a gap to it that is problematic.
Someday the pallets will weaken due to exposure, when that comes I will probably fill in those three feet with a regular deck.
The ugliest part is where water drips under the panel that lifts. Could a better design keep more moisture away? Could I use a different material for that bit of the floor? So far the outdoor rated plywood is holding up fine but discolored. I can trim the last few stained inches out with a circular saw and replace it with a composite so water and weather will never be a problem.
The best afterthought I've had is the rubber I used to seal the flexing area between the fixed roof and the panel that raises. All I could find suitable in hardware stores was a rubber shelf liner. That holds up well but a better plan would be some conveyor belt material from an industrial supply house. Even used conveyor belt would probably hold up for years in this situation. Being heavier I think would lend to it sealing better than this flimsy liner and the belt comes in long rolls. It was tough finding the liner I used in one piece because I didn't want seems.
Well two years in - who knows how what will happen in the next two years.
Before I sign off I must give a shout out to Joe Everson and Deek again! And everyone in the builder, creative community.
I think expanding the dimensions was better, at least for me. The cost was marginally more. I wouldn't dig climbing and sleeping in the loft like Deek did. Hammock is more my style and by having the extra distance between the walls that worked just right. I dropped the sky light idea early on and don't regret it. Maybe in some humid area it would be useful but it adds a lot of complexity to building and many saw strokes to materials. Also by going wider it made the loft taller. For me it means extra storage, we keep an inflatable mattress there but I still prefer the hammock.
I hope others build and share their thoughts. I have one friend who is now planning to do an A-Frame at his place.
Cheers!
23 November 2016
02 November 2016
pegs
For storing things I've installed several hooks under the framing and a couple of screws in the wall that work well for light items such as a broom. When I show up with a duffel bag for overnight something a bit sturdier would be better so I picked up a big fat dowel and a paddle bit.
![]() |
| First drill a 7/8th inch hole at a downward angle |
![]() |
| cut a dowel down to size |
![]() |
| insert into the hole |
![]() |
| two for the back side |
![]() |
| example: holding a bucket of tools |
01 October 2016
Table
She says we need a table because cooking breakfast on the deck isn't working to well, so I set out for a plan that won't take up much space and I came up with a fold down table. Simply putting a hinge against the wall was easy but then how to prop it up? Folding legs could collapse and leave breakfast on the floor or worse. Someone suggested a rope or chain and that seemed like the best fit for my situation here. Just unhook it and the chain hangs out of the way. Possibly the chains could be used for something else when the table isn't needed.
| second chain in the works to make it twice as strong |
![]() |
| close up |
![]() |
| very functional |
![]() |
| down and out of the way |
![]() |
| profile |
28 August 2015
awnings
If one noticed in my last post they saw that I'd cut a pallet at an angle. This was to give it a slope to become an awning. One above the door and the other above the window. I bought a ten foot roll of aluminum and cut it to fit, for the rear window some left over roofing material was used.
Labels:
Awning
02 April 2015
covered
I've neglected blogging for over a month, shame on me. That doesn't mean I haven't been hard at it, we've had a lot of good weather for sure.
In the last post there was still some uncovered plywood, I managed to paper that and also the other side. After that I completed all the siding front and back.
Here's a shot of me after I completed the backside planking a week later, you can see how the cedar color changed already, above the window is fresh red wood. It was a bit chilly and you can see snow in the lower right
In the last post there was still some uncovered plywood, I managed to paper that and also the other side. After that I completed all the siding front and back.
With a bit of help from Nick I've widened the cross bracing inside to make it a foot wide shelf.
Above he is breaking away ice that built up and kept the wall from opening.
Here's a shot of me after I completed the backside planking a week later, you can see how the cedar color changed already, above the window is fresh red wood. It was a bit chilly and you can see snow in the lower right
Next up I've cut a pallet to become awnings over the window and door. They were mounted using six inch screws and a lot of patience.
02 February 2015
sideline
With all the roofing done, or so I thought, it was time to begin covering the walls. When I first started this project I was going to cut pallet decks down to shingles and do the walls with that. I did cut some down and will use them somewhere but it would take far more pallet shingles to cover a 12' x 13' triangle than I have time to scrounge up on this project.
Nearby is a cedar mill and while the half inch siding there will cost more than pallet wood it has the wonderful benefit of being insect resistant. And the smell is very nice too. Eight foot planks are only three dollars for B grade so I'll be able to cover both walls for less than $200. Below I am getting started and you can see the flip-up roof open.
There was a little oopsie with the Tuftex panels and that is my fault. Running out of daylight last time I had screwed down the ends but not had time to fasten across the top and it seems the wind must have gotten strong and popped the middle one out. Only a tiny piece tore off the corner that overlaps the next panel so I was able to salvage it. If it doesn't work out I can unscrew the panel and replace it with a fresh one any time. In fact the whole cabin has been screwed except for the roof, I went with the nails recommended by Ondura for their roof.
Flooring, my friend has some left overs from work and it it'll cover the whole 120 square feet then I'm all set!
I started totaling up receipts last week and if I have all of them it looks like I've topped $1000 now. Not too bad in my opinion and I'm about 90% done building, maybe $200 away from completion.
Sunday poured rain all day so until the next good weather - cheers.
Nearby is a cedar mill and while the half inch siding there will cost more than pallet wood it has the wonderful benefit of being insect resistant. And the smell is very nice too. Eight foot planks are only three dollars for B grade so I'll be able to cover both walls for less than $200. Below I am getting started and you can see the flip-up roof open.
![]() |
| scaffold ladder is so handy! |
There was a little oopsie with the Tuftex panels and that is my fault. Running out of daylight last time I had screwed down the ends but not had time to fasten across the top and it seems the wind must have gotten strong and popped the middle one out. Only a tiny piece tore off the corner that overlaps the next panel so I was able to salvage it. If it doesn't work out I can unscrew the panel and replace it with a fresh one any time. In fact the whole cabin has been screwed except for the roof, I went with the nails recommended by Ondura for their roof.
Flooring, my friend has some left overs from work and it it'll cover the whole 120 square feet then I'm all set!
I started totaling up receipts last week and if I have all of them it looks like I've topped $1000 now. Not too bad in my opinion and I'm about 90% done building, maybe $200 away from completion.
Sunday poured rain all day so until the next good weather - cheers.
Labels:
cedar
26 January 2015
An Epoch
Dry-in, stage two is complete wahoo!
It has been a few weeks since posting, some rough ones in the middle where weather was decent but health was not.
First some catch-up -
Dec 26
Seems I've been a bit lazy in my posts and so I should mention that my good friend Rod came out post Christmas and helped me install the door, make some skilled cuts and also get plywood started on the roof. Following the New Years Day post weather for the weekend cooperated and I got 30# felt installed on all the roof albeit with light rain going on so I had to do this under the blowing tarp ending the day with a tar-paper shack.
Jan 11
A few weeks later on the 11th my father-in-law helped me get the front and rear walls sheathed and frame in the flip up roof. Big feature of that day was installing the pipe through the wall which acts as a hinge for the flip up!
Back to the present -
Saturday there was snow but the temp was heading toward 50 so I was eager to get out after being cooped up and ill. I was able to get most all the Ondura roofing on. It meant tromping in constant mud on the uphill side but a couple of cold toes couldn't slow things down.
My figures left me one sheet shy of completion where I'd needed to have one cut into 24" pieces to complete the last gap. Sunday was promising to be another fine day but I was tapped out on funds until my lovely bride came up with some extra and away I went!
Happy to report that all roofing is done and all the building needs is cedar siding on the front and back walls. Everything else will be the basic interior.
It has been a few weeks since posting, some rough ones in the middle where weather was decent but health was not.
First some catch-up -
Seems I've been a bit lazy in my posts and so I should mention that my good friend Rod came out post Christmas and helped me install the door, make some skilled cuts and also get plywood started on the roof. Following the New Years Day post weather for the weekend cooperated and I got 30# felt installed on all the roof albeit with light rain going on so I had to do this under the blowing tarp ending the day with a tar-paper shack.
Jan 11
A few weeks later on the 11th my father-in-law helped me get the front and rear walls sheathed and frame in the flip up roof. Big feature of that day was installing the pipe through the wall which acts as a hinge for the flip up!
And here is how it looks with the tarp on the convertible side
Saturday there was snow but the temp was heading toward 50 so I was eager to get out after being cooped up and ill. I was able to get most all the Ondura roofing on. It meant tromping in constant mud on the uphill side but a couple of cold toes couldn't slow things down.
My figures left me one sheet shy of completion where I'd needed to have one cut into 24" pieces to complete the last gap. Sunday was promising to be another fine day but I was tapped out on funds until my lovely bride came up with some extra and away I went!
Happy to report that all roofing is done and all the building needs is cedar siding on the front and back walls. Everything else will be the basic interior.
![]() |
| Tuftex panels complete the shell just as light rain comes in, the wall is halfway lifted up here so I can screw in the bottom of each panel. |
At this point it was good to feel like a complete structure. No more worries about weather ruining things means not being pressed for time even though every hour has been a joy. The wall is easy to raise and takes a couple of steps to ease it back down into closed position.
This is how Sunday started.
No more tarp after this! |
Buddy decided it was warmer if
he hung out in this corner. |
For the next step I should be visiting the cedar mill for planks which will complete the outside shell, stay tuned for that.