23 November 2014

More on the floor

Another day with great weather, I was able to measure and cut lumber, haul and generally screw around. Having planned to be in Florida last week worked out well since it was totally freezing at home. Decent temps prevailed yesterday but today it's pouring rain so here I am posting instead of working.

nice day for working, adding the second row here
Picked up where I'd left off by adding the 2x6 joist and outside band. After adding pallets 4 and 5 to the floor I could tell it was sturdy.

The 5th pallet was in but all the screws were used. I did some prep work drilling pilot holes for some of the hard to reach spots with an eye on making number six install easier. Still there was just enough daylight and good weather to run to the store for more screws so I did.



Wish I'd gotten an earlier start, to the reader it probably looks like I'm slow but it just takes a lot of time to strap things down and haul them uphill. Getting things level without a helper takes more time too so I'm using bar clamps to hold things in place. Also there is a lip sticking up since plywood will cover the pallet joists. I have to keep that lip even.

(above left) No problem supporting my weight at all.

(left) Blocks counterweight the floor joist while I add another pallet.

Almost wrapped but out of daylight and battery.
Coming back with more screws I added the next 2x6 so the outside band is complete for runs one and two. Got it even with the pallet and then tilted it up to level out the whole game.

As I started tacking the last pallet in place the screwdriver battery ran out completely so I had to call it a day.

Next time I will not bring the stubborn Corgi, short legs does not like going uphill much. She cost me some time. Funny though, once I got here up there she rested up and hiked her way further up in the woods just to lounge in the leaves.


I should be able to complete the third and fourth rows and thus the whole floor if we get another day with decent temps. That's my main hope before winter really stalls the project until spring.




30 October 2014

Floor joists substituted with pallets


One thing I'd like to see feed back on is this plan to make the floor joists using pallets. I have scoured the internet for terms like "pallet structure" and such, I have looked at many sheds and small house designs but so far any real building projects appear to use traditional floor joists the same as standard houses are built upon. So if anyone has attempted this or has engineering knowledge I'd like to hear from you. More than likely I will just find experience and post my thoughts here later.

I found one person who built a deck in their yard but that is not the same since they had a level spot and just put pallets on the ground and decked over it. Even if this project is not very permanent I can't go with that plan. A. my site is definitely not level. B. I'd never put even treated wood right on the ground, it won't last more than two years without a problem. Considering there will be a decent weight on top of my floor I don't want to deal with rot if I can avoid it. C. by being elevated if there is any problem underneath I will be able to get to it.

So my floor will be elevated a few inches at the least and a few feet at the other end. Building on piers and trying to keep them about five feet apart as best the terrain will allow.
two layers and foundation piles
notice each layers orientation

To get pallets to be rigid I will do one layer on bottom with another on top but turned 90 degrees which I hope will be strong enough. Likely to add some 2x6 material in there if necessary. Atop the "joists" will be a layer of playwood for subflooring and should aid a little to prevent flexing.

staggered 

underside with one pallet highlighted


Anyone who wants to check out the plan more can find the Sketchup file here. The three sizes of concrete blocks can be seen in the breakdown.